A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy

Permalink: http://skupnikatalog.nsk.hr/Record/nsk.NSK01001045862/Details
Matična publikacija: International journal for engineering modelling
29 (2016), 1/4 ; str. 37-52
Glavni autori: Chiu, Yuan-Shyi Peter (Author), Hsieh, You-Tsung, Kuo, Jyun-Sian, Chiu, Singa Wang
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Elektronička verzija članka
LEADER 01158naa a2200313 i 4500
001 NSK01001045862
003 HR-ZaNSK
005 20191107131859.0
007 ta
008 191107s2016 ci | |0|| ||eng
035 |a (HR-ZaNSK)001045862 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
042 |a croatica 
044 |a ci  |c hr 
080 1 |a 338  |2 2011 
080 1 |a 51  |2 2011 
100 1 |a Chiu, Yuan-Shyi Peter  |4 aut 
245 1 2 |a A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy :  |b I. dio: Using single-machine production scheme /  |c Yuan-Shyi Peter Chiu, You-Tsung Hsieh, Jyun-Sian Kuo, Singa Wang Chiu. 
300 |b Ilustr. 
504 |a Bibliografija: 35 jed. 
504 |a Summary 
653 0 |a FPR model  |a Ograničena proizvodnja  |a Isporuka  |a Proizvodni sustavi 
700 1 |a Hsieh, You-Tsung  |4 aut 
700 1 |a Kuo, Jyun-Sian  |4 aut 
700 1 |a Chiu, Singa Wang  |4 aut 
773 0 |t International journal for engineering modelling  |x 1330-1365  |g 29 (2016), 1/4 ; str. 37-52  |w nsk.(HR-ZaNSK)000012407 
981 |b B11/16 
998 |b rpeo1911 
856 4 1 |u https://hrcak.srce.hr/184898  |y Elektronička verzija članka