A methodology for improving productivity of the existing shipbuilding process using modern production concepts and the AHP method
| Permalink: | http://skupnikatalog.nsk.hr/Record/nsk.NSK01001036658 |
|---|---|
| Matična publikacija: |
Brodogradnja 68 (2017), 3 ; str. 37-56 |
| Glavni autori: | Stanić, Venesa (Author), Fafanđel, Nikša, Matulja, Tin |
| Vrsta građe: | Članak |
| Jezik: | eng |
| Predmet: | |
| Online pristup: |
Elektronička verzija članka |