Using of A’WOT to design an enhanced planned maintenance system (e-PMS) on-board ship
Permalink: | http://skupnikatalog.nsk.hr/Record/nsk.NSK01001035674/Details |
---|---|
Matična publikacija: |
Brodogradnja 68 (2017), 1 ; str. 61-75 |
Glavni autori: | Akyuz, Emre (Author), Celik, Metin |
Vrsta građe: | Članak |
Jezik: | eng |
Predmet: | |
Online pristup: |
Elektronička verzija članka |
LEADER | 00965naa a2200277 i 4500 | ||
---|---|---|---|
001 | NSK01001035674 | ||
003 | HR-ZaNSK | ||
005 | 20190708114739.0 | ||
007 | ta | ||
008 | 190708s2017 ci | |0|| ||eng | ||
035 | |a (HR-ZaNSK)001035674 | ||
040 | |a HR-ZaNSK |b hrv |c HR-ZaNSK |e ppiak | ||
042 | |a croatica | ||
044 | |a ci |c hr | ||
080 | 1 | |a 629 |2 2011 | |
080 | 1 | |a 33 |2 2011 | |
100 | 1 | |a Akyuz, Emre |4 aut | |
245 | 1 | 0 | |a Using of A’WOT to design an enhanced planned maintenance system (e-PMS) on-board ship / |c Emre Akyuz, Metin Celik. |
300 | |b Ilustr. | ||
504 | |a Bibliografija i internetski izvori: 44 jed. | ||
653 | 0 | |a Brod |a Upravljanje brodom |a Održavanje broda |a SWOT analiza |a AHP |a Analitički hijerarhijski proces | |
700 | 1 | |a Celik, Metin |4 aut | |
773 | 0 | |t Brodogradnja |x 0007-215X |g 68 (2017), 1 ; str. 61-75 |w nsk.(HR-ZaNSK)000011422 | |
981 | |b B04/17 | ||
998 | |b rpeo1907 | ||
856 | 4 | 1 | |u https://hrcak.srce.hr/168172 |y Elektronička verzija članka |