Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs

Permalink: http://skupnikatalog.nsk.hr/Record/nsk.NSK01001012294/Details
Matična publikacija: Tehnički vjesnik (Strojarski fakultet)
23 (2016), 1 ; str. 9-18
Glavni autori: Cajzek, Rok (Author), Klanšek, Uroš
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Elektronička verzija članka
LEADER 01159naa a2200301 i 4500
001 NSK01001012294
003 HR-ZaNSK
005 20181109151005.0
007 ta
008 181109s2016 ci | |0|| ||eng
035 |a (HR-ZaNSK)001012294 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
041 0 |a eng  |b hrv 
042 |a croatica 
044 |a ci  |c hr 
080 1 |a 624/625  |2 2011 
100 1 |a Cajzek, Rok  |4 aut 
245 1 0 |a Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs /  |c Rok Cajzek, Uroš Klanšek. 
246 1 1 |a Optimalno terminsko planiranje građevinskih projekata s nekonveksnim troškovima pomoću mješovitog cjelobrojnog nelinearnog programiranja 
300 |b Ilustr. 
504 |a Bibliografija: 45 jed. 
504 |a Sažetak 
653 0 |a Organizacija građenja  |a Terminsko planiranje  |a Diskretna optimizacija 
700 1 |a Klanšek, Uroš  |4 aut 
773 0 |t Tehnički vjesnik (Strojarski fakultet)  |x 1330-3651  |g 23 (2016), 1 ; str. 9-18  |w nsk.(HR-ZaNSK)000084915 
981 |b B04/16 
998 |b lblo1811 
856 4 1 |u https://hrcak.srce.hr/153150  |y Elektronička verzija članka