A multi-product FPR model with rework and an improved delivery policy
Permalink: | http://skupnikatalog.nsk.hr/Record/nsk.NSK01000951097/Details |
---|---|
Matična publikacija: |
International journal for engineering modelling 27 (2014), 3/4 ; str. 111-118 |
Glavni autor: | Chiu, Singa Wang (-) |
Ostali autori: | Chiu, Yuan-Shyi Peter (-), Li, Ting-Wei, Chen, Hsin-Mei |
Vrsta građe: | Članak |
Jezik: | eng |
Predmet: |
LEADER | 01063naa a2200313 i 4500 | ||
---|---|---|---|
001 | NSK01000951097 | ||
003 | HR-ZaNSK | ||
005 | 20170203113519.0 | ||
007 | ta | ||
008 | 161209s2014 ci | |0|| ||eng | ||
035 | |a (HR-ZaNSK)000951097 | ||
040 | |a HR-ZaNSK |b hrv |c HR-ZaNSK |e ppiak | ||
041 | 0 | |a eng |b hrv | |
042 | |a croatica | ||
044 | |a ci |c hr | ||
080 | 1 | |a 338 |2 MRF 2011. | |
080 | 1 | |a 51 |2 MRF 2011. | |
100 | 1 | |a Chiu, Singa Wang | |
245 | 1 | 2 | |a A multi-product FPR model with rework and an improved delivery policy / |c Singa Wang Chiu, Yuan-Shyi Peter Chiu, Ting-Wei Li and Hsin-Mei Chen. |
300 | |b Ilustr. | ||
504 | |a Bibliografija: 28 jed. | ||
504 | |a Sažetak. | ||
653 | 0 | |a Ograničena proizvodnja |a Optimizacija |a Numerička simulacija |a Isporuka |a Matematički model | |
700 | 1 | |a Chiu, Yuan-Shyi Peter | |
700 | 1 | |a Li, Ting-Wei | |
700 | 1 | |a Chen, Hsin-Mei | |
773 | 0 | |t International journal for engineering modelling |x 1330-1365 |g 27 (2014), 3/4 ; str. 111-118 |w nsk.(HR-ZaNSK)000012407 | |
981 | |b B10/14 | ||
998 | |a lblo1612 |a rped1701 |