Using the TSP solution for optimal route scheduling in construction management

Permalink: http://skupnikatalog.nsk.hr/Record/nsk.NSK01000823905/Details
Matična publikacija: Organization, technology & management in construction
3 (2011), 1 ; str. 243-249
Glavni autor: Klanšek, Uroš (-)
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Elektronička verzija članka
LEADER 00930caa a2200265 i 4500
001 NSK01000823905
003 HR-ZaNSK
005 20121119141025.0
007 ta
008 121119s2011 ci | |||| ||eng
035 |a (HR-ZaNSK)000823905 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
042 |a croatica 
044 |a ci  |c hr 
080 |a 65  |2 MRF 1998. 
080 |a 51  |2 MRF 1998. 
100 1 |a Klanšek, Uroš 
245 1 0 |a Using the TSP solution for optimal route scheduling in construction management /  |c Uroš Klanšek. 
300 |b Ilustr. 
504 |a Bibliografija: str. 248-249 
653 0 |a Menadžment  |a Građevinarstvo  |a Planiranje trase  |a Optimizacija 
773 0 |t Organization, technology & management in construction  |x 1847-5450  |g 3 (2011), 1 ; str. 243-249 
981 |b B09/11  |p CRO 
998 |a rpeo121119 
856 4 2 |u http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=103608  |y Elektronička verzija članka