Optimal schedule of a dairy manufactory
Summary: This paper deals with short-term scheduling of the dairy industry. Two different approaches are proposed for obtaining the minimal makespan schedules. According to the first, S-graph framework is proposed to find the optimal solution of the flow-shop scheduling problem. The problem is solve...
Permalink: | http://skupnikatalog.nsk.hr/Record/nsk.NSK01000736434/Details |
---|---|
Matična publikacija: |
Chemical and biochemical engineering quarterly 23 (2009), 2 ; str. 231-237 |
Glavni autor: | Adonyi, R. (-) |
Ostali autori: | Shopova, E. (-), Vaklieva-Bancheva, N. |
Vrsta građe: | Članak |
Jezik: | eng |
Predmet: | |
Online pristup: |
Chemical and Biochemical Engineering Quarterly |
LEADER | 01969caa a2200277 ir4500 | ||
---|---|---|---|
001 | NSK01000736434 | ||
003 | HR-ZaNSK | ||
005 | 20121004113956.0 | ||
007 | ta | ||
008 | 100512s2009 ci ||| ||eng | ||
035 | |9 (HR-ZaNSK)739058 | ||
035 | |a (HR-ZaNSK)000736434 | ||
040 | |a HR-ZaNSK |b hrv |c HR-ZaNSK |e ppiak | ||
042 | |a croatica | ||
080 | |a 664 |2 MRF 1998. | ||
100 | 1 | |a Adonyi, R. | |
245 | 1 | 0 | |a Optimal schedule of a dairy manufactory / |c R. Adonyi, E. Shopova, N. Vaklieva-Bancheva. |
504 | |a Bibliografija: 16 jed | ||
520 | 8 | |a Summary: This paper deals with short-term scheduling of the dairy industry. Two different approaches are proposed for obtaining the minimal makespan schedules. According to the first, S-graph framework is proposed to find the optimal solution of the flow-shop scheduling problem. The problem is solved by applying the branch and bound technique. The second approach uses the integer programming formulation of the scheduling problem and BASIC genetic algorithm has been used to solve the optimization problem. Both approaches take into consideration volumes of units assigned to perform tasks, and respective size factors that affect the size of batches and their number must be produces to achieve production goals and thus on the schedules duration. Manufacturing of two type curds is used as a case study. The results obtained show that both approaches provide comparable solutions. Both approaches could be seen as a good alternative to project manager to find appropriate schedule of the dairy industry | |
653 | 0 | |a Mljekarska industrija |a Proizvodnja |a Programiranje proizvodnog pogona | |
700 | 1 | |a Shopova, E. | |
700 | 1 | |a Vaklieva-Bancheva, N. | |
773 | 0 | |t Chemical and biochemical engineering quarterly |x 0352-9568 |g 23 (2009), 2 ; str. 231-237 |w nsk.(HR-ZaNSK)000004762 | |
981 | |b B03/09 | ||
998 | |a Luko100512 |c vol2o121004 | ||
856 | 4 | 2 | |u http://hrcak.srce.hr/cabeq |y Chemical and Biochemical Engineering Quarterly |