Optimal schedule of a dairy manufactory

Summary: This paper deals with short-term scheduling of the dairy industry. Two different approaches are proposed for obtaining the minimal makespan schedules. According to the first, S-graph framework is proposed to find the optimal solution of the flow-shop scheduling problem. The problem is solve...

Full description

Permalink: http://skupnikatalog.nsk.hr/Record/nsk.NSK01000736434/Details
Matična publikacija: Chemical and biochemical engineering quarterly
23 (2009), 2 ; str. 231-237
Glavni autor: Adonyi, R. (-)
Ostali autori: Shopova, E. (-), Vaklieva-Bancheva, N.
Vrsta građe: Članak
Jezik: eng
Predmet:
Online pristup: Chemical and Biochemical Engineering Quarterly
LEADER 01969caa a2200277 ir4500
001 NSK01000736434
003 HR-ZaNSK
005 20121004113956.0
007 ta
008 100512s2009 ci ||| ||eng
035 |9 (HR-ZaNSK)739058 
035 |a (HR-ZaNSK)000736434 
040 |a HR-ZaNSK  |b hrv  |c HR-ZaNSK  |e ppiak 
042 |a croatica 
080 |a 664  |2 MRF 1998. 
100 1 |a Adonyi, R. 
245 1 0 |a Optimal schedule of a dairy manufactory /  |c R. Adonyi, E. Shopova, N. Vaklieva-Bancheva. 
504 |a Bibliografija: 16 jed 
520 8 |a Summary: This paper deals with short-term scheduling of the dairy industry. Two different approaches are proposed for obtaining the minimal makespan schedules. According to the first, S-graph framework is proposed to find the optimal solution of the flow-shop scheduling problem. The problem is solved by applying the branch and bound technique. The second approach uses the integer programming formulation of the scheduling problem and BASIC genetic algorithm has been used to solve the optimization problem. Both approaches take into consideration volumes of units assigned to perform tasks, and respective size factors that affect the size of batches and their number must be produces to achieve production goals and thus on the schedules duration. Manufacturing of two type curds is used as a case study. The results obtained show that both approaches provide comparable solutions. Both approaches could be seen as a good alternative to project manager to find appropriate schedule of the dairy industry 
653 0 |a Mljekarska industrija  |a Proizvodnja  |a Programiranje proizvodnog pogona 
700 1 |a Shopova, E. 
700 1 |a Vaklieva-Bancheva, N. 
773 0 |t Chemical and biochemical engineering quarterly  |x 0352-9568  |g 23 (2009), 2 ; str. 231-237  |w nsk.(HR-ZaNSK)000004762 