|
|
|
|
LEADER |
00959cam a2200265 ir4500 |
001 |
NSK01000642357 |
003 |
HR-ZaNSK |
005 |
20190125110506.0 |
007 |
ta |
008 |
070823s2007 xxua 001 0 eng |
020 |
|
|
|a 0821368583
|
035 |
|
|
|9 (HR-ZaNSK)644139
|
035 |
|
|
|a (HR-ZaNSK)000642357
|
040 |
|
|
|a HR-ZaNSK
|b hrv
|c HR-ZaNSK
|e ppiak
|
080 |
|
|
|a 338.49:65.012.4
|2 MRF 1998.
|
100 |
1 |
|
|a Irwin, Timothy C.
|
245 |
1 |
0 |
|a Government guarantees :
|b allocating and valuing risk in privately financed infrastructure projects /
|c Timothy C. Irwin.
|
260 |
|
|
|a Washington, D. C. :
|b The World Bank,
|c cop. 2007.
|
300 |
|
|
|a XI, 213 str. :
|b graf. prikazi ;
|c 23 cm.
|
490 |
0 |
|
|a Directions in development. Infrastructure
|
504 |
|
|
|a Bibliografija: str. 187-203; bibliografske bilješke uz tekst
|
504 |
|
|
|a Kazalo
|
650 |
|
7 |
|a Infrastruktura
|x Projekti
|x Financije
|2 nskps
|
760 |
0 |
|
|t Directions in development.
|w nsk.(HR-ZaNSK)000606736
|
998 |
|
|
|m vhok0709
|