|
|
|
|
LEADER |
01182cam a2200325 ir4500 |
001 |
NSK01000638078 |
003 |
HR-ZaNSK |
005 |
20190307100821.0 |
007 |
ta |
008 |
070619s2006 xxuabdh i000 0 eng |
020 |
|
|
|a 9780821366820
|
020 |
|
|
|a 0821366823
|
035 |
|
|
|9 (HR-ZaNSK)639760
|
035 |
|
|
|a (HR-ZaNSK)000638078
|
040 |
|
|
|a HR-ZaNSK
|b hrv
|c HR-ZaNSK
|e ppiak
|
080 |
|
|
|a 338.47(664)
|2 MRF 1998.
|
086 |
|
|
|a WB 3146
|2 us
|
100 |
1 |
|
|a Mazzei, Leonardo
|
245 |
1 |
4 |
|a The role of communication in large infrastructure :
|b the Bumbuna hydroelectric project in post-conflict Sierra Leone /
|c Leonardo Mazzei, Gianmarco Scuppa.
|
250 |
|
|
|a 1st printing
|
260 |
|
|
|a Washington, D. C. :
|b The World Bank,
|c 2006.
|
300 |
|
|
|a XI, 42 str. :
|b ilustr., graf. prikazi, faks., zemljop. crtež ;
|c 26 cm.
|
490 |
0 |
|
|a World Bank working paper,
|x ISSN 1726-5878 ;
|v no. 84
|
504 |
|
|
|a Bibliografija: str. 41-42
|
505 |
0 |
|
|a Bilješke uz tekst
|
505 |
0 |
|
|a Str. VII: Predgovor / Alessandro Palmieri
|
651 |
|
7 |
|a Sierra Leone
|x Infrastruktura
|2 nskps
|
700 |
1 |
|
|a Scuppa, Gianmarco
|
760 |
0 |
|
|t World Bank working paper
|w nsk.(HR-ZaNSK)000499060
|
998 |
|
|
|m nmrk0706
|m vhop0706
|